Drop in up to three Primavera P6 XER files of each project and get a one-page milestone chart: every milestone drawn with its Current, Previous and Baseline position, so a reader sees at a glance what is done, what is due next, what has moved since last time and what is later than baseline. Good enough with no settings; every part of it can be refined.
🔒 Parsed entirely in your browser, no server, no upload, no storage. Refreshing the page clears your work; save a profile to keep your settings.
How to read the chart and use the keyboard
Markers. Each milestone has up to three markers of the same shape: Current (solid, dark outline), Previous (pale fill) and Baseline (hollow, heavier grey outline). An arrow runs from Baseline to Current and a figure such as +14d means later by 14 days; a minus sign means earlier. A tick inside a marker means achieved. A bar under a marker means a hard constraint holds it in that file, and an exclamation mark means negative total float, so a milestone that has not moved can still be held.
Keyboard. Press Tab to reach every marker, lane header and key entry. Enter or Space on a marker pins its full details, and Escape closes them. Enter or Space on a lane header collapses the lane. Enter or Space on a key entry switches that element off; switch it back on under Show on chart. All the panels below are ordinary buttons, lists and fields, and the tables sort from the heading with Enter.
Exports. PNG, SVG, PDF and Excel carry exactly what is on screen. Anything switched off is left out of all of them. Movement is later minus earlier, so positive is later.
to see the chart before using your own files
Drop one or more .xer files here, or click to choose
Several files at once, and more can be added later. Files of the same project are recognised by their shared Activity IDs.
1 · Files and roles
2 · Chart
MilestonesLanesThemeShow on chartStatus rulePage, title and axis
3 · Tables and checks
What is the Milestone Tracker?
The Milestone Tracker turns Primavera P6 XER files into a one-page milestone chart. Each milestone you choose is drawn at its Current, Previous and Baseline position, in swimlanes, so a project manager can see in ten seconds what is done, what is due next, what has moved since the last report and what is later than baseline. A planner can check every date against P6: the details of each marker name the file behind every date and whether it is an actual, a forecast or a planned date, and the Checks list flags anything unusual.
How to read the chart
Three positions, one shape. The Current marker is solid with a dark outline. The Previous marker is a pale tint with a thin outline. The Baseline marker is hollow with a heavier grey outline. They differ by fill and outline as well as colour, so the chart still reads in a greyscale print.
The arrow runs from Baseline (or Previous) to Current, and the figure beside it, for example +14d, says the milestone is later by 14 days. A minus sign means earlier.
A tick inside a marker means achieved, drawn at its actual date.
The status rule is printed in the key. By default a milestone is judged against its Baseline: on or earlier is on time, later by up to 14 days is minor, later by more is major. You can change the basis (Baseline, Previous, a contract date or total float), the limit and the units.
The red line is the Current data date, and the pale band after it is the look-ahead window (three months by default).
Why a milestone that has not moved still needs its float checked
A milestone on the same date in every file may be held there by a hard constraint, with negative total float underneath. A bar under the marker shows a hard constraint and an exclamation mark shows negative float. Read “no movement” together with those marks and the Checks table.
Two layouts, five themes, five page formats
Timeline packs the milestones into as few rows as their labels allow, which makes a plan on a page. Listed gives one row per milestone with data columns beside the time axis, which a planner can check line by line. Themes include a greyscale print theme, a colour-blind-safe theme and a high-contrast theme, and you can duplicate any theme, edit it and share it as a file. Pages are A4 or A3 in either orientation, or a 16:9 slide. When the chart is too tall for one page you can fit it to one page or split it across pages at lane boundaries.
Next month
Save a profile once you are happy with the chart. Next month, drop in the new file, use Roll forward, and load the profile. Anything in the profile that no longer matches the new files is listed rather than silently dropped.
Frequently asked questions
Which files can I use?
Primavera P6 XER files, saved from P6 with the usual export. Load up to three files of each project: the Current update, the Previous update and a Baseline. You can load files for several projects at once, up to 30 files in all, and add more later. A file with several projects inside it shows a project picker, and the same file can be used twice if the Baseline is held as a second project inside it.
How does it know which files belong to the same project?
By the Activity IDs they share, never by project ID or project name. Monthly updates of one project are separate P6 copies with different project IDs, so the tool counts the Activity IDs two files have in common. A file joins the group it overlaps most if the overlap is at least 30 per cent, and it is flagged if it shares fewer than 60 per cent of its IDs with the Current file.
Which roles does each file get?
For each project the file with the latest data date is Current, the next latest is Previous and the earliest is Baseline. With only two files the older one is Previous, unless its file name or project name says baseline. The roles are shown plainly in the file table and can be swapped with one click.
Which date is plotted for a milestone?
The actual date if the milestone has been achieved in that file. Otherwise the forecast (early) date, and if the file has no forecast the planned (target) date, which is noted in the details of the marker and listed in the Checks table. A finish milestone is plotted at its finish and a start milestone at its start.
What do later, earlier and the figures in days mean?
Every movement is the later date minus the earlier one, so a positive number means later. It is counted in calendar days by default. You can switch to working days on the milestone calendar, which uses the weekly pattern and holidays held in the P6 file. Every table, the key and the Excel file state the unit.
Why does a milestone that has not moved still need its float checked?
A milestone can sit on the same date in every file because a hard constraint is holding it there, while its total float is negative. The chart marks a hard constraint with a bar under the marker and negative float with an exclamation mark, and the Checks table lists both. Read "no movement" together with these marks.
How is this different from Schedule Comparison?
Schedule Comparison compares whole schedules and explains what changed and why it matters. The Milestone Tracker draws one page: each chosen milestone at its Current, Previous and Baseline position, in swimlanes, ready to print or put on a slide. It does not trace logic or assess causes. You can also track the start or finish of an ordinary activity if you need to.
How do I update it next month?
Drop the new XER in and use "Roll forward with a new file": the new file becomes Current, the old Current becomes Previous and the Baseline stays. Then load last month's profile, which restores your selection, lanes, theme, status rule and page settings, and tells you anything that no longer matches.
Is anything uploaded or stored?
No. Your files are read in your browser and every export is a download. Refreshing the page clears your work, so save a profile if you want to keep your settings. The only thing the site records is an anonymous count of how often the tool is opened.
Can I print it or put it on a slide?
Yes. Choose a page format (A4, A3, portrait or landscape, or a 16:9 slide), then export PNG, SVG, PDF or Excel. The PDF can also carry the milestone, changes, checks and file register tables on the pages that follow. Everything switched on in the chart appears in every export and everything switched off is left out. Printing from the browser prints the same chart pages.